亚洲国产中文91在线无码_成年午夜一级毛片视频_黄影视在线观看免費資訊_午夜福利AⅤ毛片在线看_蜜柚免费观看视频大全下载_国日韩产超清无码 片内射_欧美国产日韩淫荡视频_日韩少妇人妻无码综合一区二区_色综合综合热视频_被翁持续侵犯的中文字幕

Welcome to visit shandong zhongtaitongze machinery co., LTD. !

Shandong mosen machinery co., LTD.

service phone :18265607258

CONTACT

shandong zhongtaitongze machinery co., LTD.

Phone:0536-6188269

TEL:18265607258(Manager yu)

Website:yinyue5.cn

Address:Shandong zhucheng Michigan east road no. 7800

What are the problems should be paid attention to after sterilization pot is running?

Source: Time:2018-06-21 17:30:52 views:

Customers feel use sterilization pot safety and health, this is because the device design hold safety valve, pressure gauge, thermometer, such as accessories, to keep safety, complete, sensitive and reliable. In use process should add maintenance and check regularly.

Customers feel use sterilization pot safety and health, this is because the device design hold safety valve, pressure gauge, thermometer, such as accessories, to keep safety, complete, sensitive and reliable. In use process should add maintenance and check regularly. This equipment safety valve and pressure jump is equal to the design pressure, should maintain a sensitive and reliable. So, after sterilization pot operation should pay attention to what issues?

1, should prevent adjusted freely. Pressure gauge, thermometer, precision grade of 1.5, within the tolerance allowed differences is normal.

2, before each product into the pot, the machinist must check whether the pot someone or other sundry, confirmed rear can push products into the pot.

3, must first check after each product into the pan pan door seal is broken or groove, confirmed rear can lock the pan door closed properly.

4, equipment operation, the machinist must be on the scene, closely monitor the pressure gauge, the operation of the water level gauge, safety valve, handle in time when problems found.

5, product into and out of the pot when it is forbidden to shove rammed, prevent damaged pipeline and temperature sensor.

6, alarm prompt appeared in the process of equipment operation, machinist must quickly find the reason, adopt corresponding measures.

7, tractor driver heard running after prompt alarm to timely close control switch, at the same time open the exhaust valves and observe the pressure gauge and water level gauge instructions and confirmation of water level and pressure in the pot is zero can open the door.

8, sterilization pot is strictly prohibited to work in spite of, there are problems timely notify the equipment maintenance personnel, it is strictly prohibited to remove the maintenance.

9, sorting health, clean it with equipment, must be on operating screen protection, ensure operation screen dry water.



Previous:Already the first article

next:Using autoclave common failure problem

Return